Match Commissioning Meter Accuracy and Range to the Signal
Construction terms explained
- OEM:
- original equipment manufacturer
- Use before
- Functional performance testing · Integrated systems testing · Reliability / load demonstration
- Action
- Document the instrument type, operating range, stated accuracy, calibration status, signal method, and placement against the measurement being resolved before accepting the data.
- Responsible role
- Commissioning instrumentation lead
- Warning signs
- A small temperature or flow delta is close to the sensor's stated accuracy. · Three-phase electrical evidence relies on an unsuitable meter or undocumented placement.
- Sources
- U.S. Department of Energy, Federal Energy Management Program, with National Renewable Energy Laboratory
Why this matched
- Scenario
- Cooling load test
- Upcoming activity
- Direct activity match · Reliability / load demonstration
- System
- Direct system match · Controls and OT, Cooling
Test, contingency and procedure prompts
Changes are saved on this device for this project example.
View sources and context