What to check before the work begins
Document the instrument type, operating range, stated accuracy, calibration status, signal method, and placement against the measurement being resolved before accepting the data.
- Document the instrument type, operating range, stated accuracy, calibration status, signal method, and placement against the measurement being resolved before accepting the data.
- Compare expected signal magnitude and delta to the instrument range and stated accuracy.
- Confirm appropriate three-phase true-RMS, flow, or temperature method and placement for the measurement.
- Record calibration status and project-required traceability before accepting results.