Close the UPS Installation Checklist Before First Start
Construction terms explained
- UPS:
- uninterruptible power supply
- OEM:
- original equipment manufacturer
- HVAC:
- heating, ventilation, and air conditioning
- Use before
- Energisation · Installation turnover
- Action
- Hold first start until the applicable purchased-equipment installation checklist is complete and retained, including power, neutral, ground, signals, EPO, covers, accessories, HVAC, cleanliness, access, and workspace items.
- Responsible role
- Authorized OEM service engineer
- Warning signs
- The checklist belongs to a different model, voltage, or revision. · HVAC, EPO, controls, covers, cleanliness, or workspace are treated as post-start punch items.
- Sources
- Eaton
Why this matched
- Scenario
- UPS energisation
- Upcoming activity
- Direct activity match · Energisation
- System
- Direct system match · UPS and batteries
Test, contingency and procedure prompts