Pearl · Controls and OT
Align OT Alternate Power With Graceful Shutdown and Continuity Needs
Map each critical OT component to its intended outage behavior and required alternate-power duration, then prove the project-defined transition.
Use before: Integrated systems testing · Operations acceptance and ready for service
Sources: National Institute of Standards and Technology
Read Pearl