Construction terms explained
ATS: automatic transfer switch
UPS: uninterruptible power supply
OT: operational technology
TCS: technology cooling system
FPT: functional performance testing
IST: integrated systems testing
TAB: testing, adjusting, and balancing
OEM: original equipment manufacturer
HVAC: heating, ventilation, and air conditioning
HDD: hard disk drive
SSD: solid-state drive
IT: information technology
MOP: method of procedure
SOP: standard operating procedure
EOP: emergency operating procedure
MEP: mechanical, electrical, and plumbing Pearl · Commissioning management
Put system and assembly prerequisites in the script and evidence them before functional test release.
Use before: Functional performance testing · Integrated systems testing
Sources: U.S. General Services Administration
Read Pearl Pearl · Commissioning management
Complete the applicable delivery, installation, startup, TAB, controls, and component-readiness checklists before FPT.
Use before: Functional performance testing · Installation turnover
Sources: U.S. General Services Administration
Read Pearl Pearl · UPS and batteries
After repeated consequential battery failures, define the credible common-mode population and obtain an explicit retain, inspect, quarantine, modify, or replace disposition before accepting the remaining units.
Use before: Installation turnover · Startup · Functional performance testing · Early-life review
Sources: Chirisa Technology Parks · Data Center Dynamics · U.S. Department of Veterans Affairs · WTVR CBS 6
Read Pearl Pearl · Commissioning management
Define the initial configuration and verify restoration to normal operation in every functional test procedure.
Use before: Functional performance testing · Integrated systems testing
Sources: U.S. General Services Administration
Read Pearl Pearl · Commissioning management
Release a test procedure only when authorship, direction, execution, witnessing, documentation, and acceptance roles are explicit.
Use before: Factory acceptance testing and submittals · Functional performance testing · Integrated systems testing
Sources: U.S. Department of Energy, Federal Energy Management Program · U.S. General Services Administration
Read Pearl Pearl · Commissioning management
Predefine acceptable performance and preserve actual conditions, results, exceptions, issue references, and dated signoff.
Use before: Functional performance testing · Integrated systems testing · Operations acceptance and ready for service · Reliability / load demonstration
Sources: U.S. General Services Administration
Read Pearl Pearl · Commissioning management
Identify and stage the instruments, tools, adapters, consumables, and supplies specified for the test before release.
Use before: Functional performance testing
Sources: U.S. General Services Administration