What to check before the work begins
Validate project-defined electrical operating and configuration cases at forecast initial and partial load and document how future buildout changes the basis.
- Validate project-defined electrical operating and configuration cases at forecast initial and partial load and document how future buildout changes the basis.
- Define forecast initial, low, partial, transition, and future electrical loading and configuration cases.
- Identify equipment behavior, metering range, alarms, redundancy, and controls assumptions affected by each case.
- Record feasible test or analysis evidence and the approved future-buildout trigger.