What to check before the work begins
Inspect the complete intended airflow path before turnover and after relevant cable, tray, conduit, tile, containment, or equipment reconfiguration.
- Inspect the complete intended airflow path before turnover and after relevant cable, tray, conduit, tile, containment, or equipment reconfiguration.
- Inspect underfloor, overhead, containment, tile, rack, and return paths against the design intent.
- Identify cable, tray, conduit, opening, tile, or equipment changes that can create bypass or recirculation.
- Recheck the path after material reconfiguration rather than carrying prior acceptance forward.